{"id":203,"date":"2021-01-31T09:20:13","date_gmt":"2021-01-31T09:20:13","guid":{"rendered":"http:\/\/energyconsultantengineers.com\/en\/?p=203"},"modified":"2021-01-31T10:59:19","modified_gmt":"2021-01-31T10:59:19","slug":"abnoos-hotel-complex-tehran","status":"publish","type":"post","link":"http:\/\/energyconsultantengineers.com\/en\/abnoos-hotel-complex-tehran\/","title":{"rendered":"Abnoos Hotel Complex &#8211; Tehran"},"content":{"rendered":"<p>Abnoos hotel complex is under construction along Shahid Bakery Highway in Tehran and has two-sections: North hotel (4-stars) &amp; South hotel (5-stars luxury). The total area of these hotels is about 100,000 square meters. The main applications of the complex are: guest rooms, commercial units, ancillary spaces &amp; back of house.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-157 alignright\" src=\"http:\/\/energyconsultantengineers.com\/en\/wp-content\/uploads\/sites\/2\/2019\/11\/Picture1-1-700x464-1.png\" alt=\"\" width=\"474\" height=\"314\" srcset=\"http:\/\/energyconsultantengineers.com\/en\/wp-content\/uploads\/sites\/2\/2019\/11\/Picture1-1-700x464-1.png 700w, http:\/\/energyconsultantengineers.com\/en\/wp-content\/uploads\/sites\/2\/2019\/11\/Picture1-1-700x464-1-250x166.png 250w, http:\/\/energyconsultantengineers.com\/en\/wp-content\/uploads\/sites\/2\/2019\/11\/Picture1-1-700x464-1-120x80.png 120w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"Abnoos hotel complex is under construction along Shahid Bakery Highway in Tehran and has two-sections: North hotel (4-stars) &amp; South hotel (5-stars luxury). The total area of these hotels is about 100,000 square meters. The main applications of the complex are: guest rooms, commercial units, ancillary spaces &amp; back of house.","protected":false},"author":1,"featured_media":231,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-203","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"_links":{"self":[{"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/posts\/203","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/comments?post=203"}],"version-history":[{"count":1,"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/posts\/203\/revisions"}],"predecessor-version":[{"id":204,"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/posts\/203\/revisions\/204"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/media\/231"}],"wp:attachment":[{"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/media?parent=203"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/categories?post=203"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/tags?post=203"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}