{"id":30,"date":"2019-11-25T22:28:47","date_gmt":"2019-11-25T22:28:47","guid":{"rendered":"http:\/\/localhost\/denanaseri\/fa\/?p=30"},"modified":"2021-01-31T09:00:10","modified_gmt":"2021-01-31T09:00:10","slug":"proj-four","status":"publish","type":"post","link":"http:\/\/energyconsultantengineers.com\/en\/proj-four\/","title":{"rendered":"Proj Four"},"content":{"rendered":"<p>&nbsp;<\/p>\n<p>Roofed area of the plant is 184000 square meters in a land with 270 hectares in Bandar Abbas with capacity of 330000 tons Aluminum in the year and is the biggest Aluminum Manufacturing Company in Iran and even in the world.<\/p>\n<p>Complete infrastructure Plan includes common tunnel of installation passing, gas supplying with high pressure network, compress air power with high voltage and telecommunications were performed and supervised by engineers of this company. Meanwhile, this company is coordinator and supplier of installations and requirements of different buildings consultants and construction site of this project.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-126\" src=\"http:\/\/energyconsultantengineers.com\/en\/wp-content\/uploads\/sites\/2\/2019\/11\/01-2-700x525-1.jpg\" alt=\"\" width=\"463\" height=\"348\" srcset=\"http:\/\/energyconsultantengineers.com\/en\/wp-content\/uploads\/sites\/2\/2019\/11\/01-2-700x525-1.jpg 700w, http:\/\/energyconsultantengineers.com\/en\/wp-content\/uploads\/sites\/2\/2019\/11\/01-2-700x525-1-250x188.jpg 250w, http:\/\/energyconsultantengineers.com\/en\/wp-content\/uploads\/sites\/2\/2019\/11\/01-2-700x525-1-120x90.jpg 120w\" sizes=\"auto, (max-width: 463px) 100vw, 463px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"&nbsp; Roofed area of the plant is 184000 square meters in a land with 270 hectares in Bandar Abbas with capacity of 330000 tons Aluminum in the year and is the biggest Aluminum Manufacturing Company in Iran and even in the world. Complete infrastructure Plan includes common tunnel of installation passing, gas supplying with high&#8230; <a class=\"view-article\" href=\"http:\/\/energyconsultantengineers.com\/en\/proj-four\/\">Read More<\/a>","protected":false},"author":1,"featured_media":129,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-30","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"_links":{"self":[{"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/posts\/30","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/comments?post=30"}],"version-history":[{"count":6,"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/posts\/30\/revisions"}],"predecessor-version":[{"id":176,"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/posts\/30\/revisions\/176"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/media\/129"}],"wp:attachment":[{"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/media?parent=30"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/categories?post=30"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/energyconsultantengineers.com\/en\/wp-json\/wp\/v2\/tags?post=30"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}